Projects:
3rd line Iran Gas TC50 or 50 Units Project 5th IGAT5 Line Project
First executive of making 25 Megawatt Turbo Compressor in Iran by Transferring Technical Knowledge from Siemens Company. First owner of ISO 9001-2000 in Management of making & Manufacturing 25 Mega Watt Turbo Compressor in Iran and the executive of EPC in 5th Pipe line (IGAT 5) consulting in Design and Engineering Gas Pressure Fortification Station. Consulting in Internal making, Usage, Repair, Maintenance of different kinds of Turbo Compressor, Turbo Generators.
Consulting in Technical, Economical and Internal & International Tenders assessment
Field of Oil Turbo Compressor Turbine Activities :
1- Part Manufacturing
2- Assembly of core engine
3- Hot test of gas turbine
4- Maintenance and after sale services
5- Every other activities in oil and gas field
Field of Oil Turbo Compressor Construction Activities :
OTCC offers a wide range of construction Engineering services ,as follows:
- Material supply and engineering procurement for industrial projects based on technical specifications and worldwide standards.
- Construction and installation activities in oil , gas and petrochemical projects for all disciplines such as civil , mechanical , piping , Electrical and instruments by specialized experts and certified Groups.
- Supervision of construction and installation activities in industrial projects.
- Phasing, timing , Planning , Monitoring and all project Control Services for Industrial system and Equipment.
Field of Pars Kala Gas Commercial Services Activities:
Procurement of various items and goods which are needed in oil and gas industries, such as those used in refineries , pipelines ,Gas compressor stations and etc. , are the most important KGC’s activities , Marketing , Exporting of sulfur and Condensate , Providing of
Commercial services , Custom clearances , Insurance and transportation services are in KGC’s scope.
Field of Oil Turbo Compressor Company activities :
Localization of turbo compressor in Iran.
Designing and engineering of exporting and boosting Gas stations.Establishment a JVC with foreign companies to support localization and after sale services. Implementation of exist and free capacities of Iranian vendors Construction and commissioning of compressor stations. To be as EPC and GC contractor.
Field of Oil Turbo Compressor Equipment activities :
HG manufacturing : All system or sub systems have known by a HG no. , then prior of any packaging activities , the required HGS must be manufactured and delivered to the workshop .
Packaging :
This activity consists of 4 steps :
Mechanical including erection of electrical equipment ,wiring and cabling .
Piping: erection of all pipes and Hydrostatic test.
Welding : sizing ,cutting of pipes , then welding together to flanges.
Production capacity :
Presently the production capacity stands at 25 units /year . However with some new investment , this capacity can be in creased to 50 units, should there be an increase in received purchase orders.
|